Architect: Studio 3 Design Group
Principal in Charge: James I. Webb Location: Martinez, GA Size: 12,000 SF Cost: $3.5 Million Completed: 2016 services
Full Architectural Engineering Mechanical Structural learn more
Studio 3 Design Group designed a new facility for Dr. Anna Kate Duckworth and Dr. Sarah Cely. Construction was provided by their husbands, Patrick Duckworth and Jim Cely of Duckworth Development, LLC. The architecture is a reflection of the southern charm espoused by the practice. |
Photo credit: Steve Bracci Photography